Role Termination & Testing Client Representative required for Offshore Wind Farm Construction Developer based in the United States. Responsibilities Acting as the Developer's representative for the inspection and quality assurance of jointing, termination and testing of cables at site Understand the Developer's quality TR(s) and product relevant IEC standards, and ensure that supplier comply with all the above Inspecting cable systems including cable hang off systems and termination of HVC and FOC at OSS or FOU location in accordance with project requirements, TRs, standards and designated inspection reporting tool Witnessing VLF, sheath, HVRT and OTDR testing, as well as other cable or termination test that might be required Reviewing T&T-related documentations including procedures are in accordance with accepted RAMS from supplier/contractor prior to offshore/onshore T&T campaign Complying with and enforcing the Developer QHSE requirements at site Preparing DPR to Export or Array Cable Technical Scope Manager (depending on allocated scope) and updating progress table as required by the Project Preparing or ensuring approved PtW is in placed prior to T&T activities at site Interfacing and ensuring effective communication with WTG, FOU, OnSS, OSS, CONS and OCI teams at site Preparing or adapting inspection checklists for testing activities during offshore/onshore T&T phase (incl. use of Digital Inspection Tool, DIT) Ensuring cable T&T activities are carried out in safe environment and in due time, including ensuring availability of calibrated test equipment at site Gathering weather data and ensuring T&T activities can be carried out within acceptable weather window at site Ensuring daily shift report is handed over and clearly communicated to the next inspector by end of shift Responsible for Management of Change (not covered under change request) Responsible for the punch list, handover certification, NCR management and LL in Synergi during offshore/onshore T&T phase. This includes communicating any non-conformance/damage defect notifications at site to the Developer's Project Engineer Reviewing and accepting T&T-related as-built documentations Participating in internal team and external supplier's T&T-related meetings Providing input to the Monthly HVC Quality Report including up-to-date NCRs, LL, risks/opportunities and quality-related issues to Lead QA Project Engineer Cost schedule and expenses Requirements Previous experience as Client Representative in Offshore Wind. B1 OCS wind activities Visa holder Skills in HV/MV cable jointing/termination, cable ladder/cleating systems, subsea cable hang off systems, earthing and bonding of cable systems. Strong QHSE awareness in an industrial/construction/offshore sector. Ability to interpret industry standards and familiar with HVC and FOC testing. Familiar with high voltage equipment in general, including cables and accessories (voltage level from and above 33kV)
Sep 01, 2025
Contractor
Role Termination & Testing Client Representative required for Offshore Wind Farm Construction Developer based in the United States. Responsibilities Acting as the Developer's representative for the inspection and quality assurance of jointing, termination and testing of cables at site Understand the Developer's quality TR(s) and product relevant IEC standards, and ensure that supplier comply with all the above Inspecting cable systems including cable hang off systems and termination of HVC and FOC at OSS or FOU location in accordance with project requirements, TRs, standards and designated inspection reporting tool Witnessing VLF, sheath, HVRT and OTDR testing, as well as other cable or termination test that might be required Reviewing T&T-related documentations including procedures are in accordance with accepted RAMS from supplier/contractor prior to offshore/onshore T&T campaign Complying with and enforcing the Developer QHSE requirements at site Preparing DPR to Export or Array Cable Technical Scope Manager (depending on allocated scope) and updating progress table as required by the Project Preparing or ensuring approved PtW is in placed prior to T&T activities at site Interfacing and ensuring effective communication with WTG, FOU, OnSS, OSS, CONS and OCI teams at site Preparing or adapting inspection checklists for testing activities during offshore/onshore T&T phase (incl. use of Digital Inspection Tool, DIT) Ensuring cable T&T activities are carried out in safe environment and in due time, including ensuring availability of calibrated test equipment at site Gathering weather data and ensuring T&T activities can be carried out within acceptable weather window at site Ensuring daily shift report is handed over and clearly communicated to the next inspector by end of shift Responsible for Management of Change (not covered under change request) Responsible for the punch list, handover certification, NCR management and LL in Synergi during offshore/onshore T&T phase. This includes communicating any non-conformance/damage defect notifications at site to the Developer's Project Engineer Reviewing and accepting T&T-related as-built documentations Participating in internal team and external supplier's T&T-related meetings Providing input to the Monthly HVC Quality Report including up-to-date NCRs, LL, risks/opportunities and quality-related issues to Lead QA Project Engineer Cost schedule and expenses Requirements Previous experience as Client Representative in Offshore Wind. B1 OCS wind activities Visa holder Skills in HV/MV cable jointing/termination, cable ladder/cleating systems, subsea cable hang off systems, earthing and bonding of cable systems. Strong QHSE awareness in an industrial/construction/offshore sector. Ability to interpret industry standards and familiar with HVC and FOC testing. Familiar with high voltage equipment in general, including cables and accessories (voltage level from and above 33kV)
Market Access & Settlements Manager required for a major Offshore Wind Developer based in The United Kingdom Responsibilities Manage the end-to-end Elexon BSC accession process, including authorised persons, party role registration, BMU registration, and credit cover requirements. Secure any required waivers or testing approvals. Oversee appointment and coordination with Meter Operator Agent Manage installation, testing, and registration of SVA and CVA metering in compliance with CoP requirements. Ensure alignment of metering, aggregation rules, and data flows. Negotiate and execute pre-energisation supply agreements. Manage existing PPAs with ESB and SSE, including: Scheduling and dispatch coordination. Settlement and reconciliation of Balancing Mechanism revenues. Interface with trading desks to optimise offtake revenue. Oversee operational delivery of secured CfDs, including reporting, settlement, and compliance with Low Carbon Contracts Company (LCCC) obligations. Develop and deliver strategies for participation in the Capacity Market and ancillary services markets to maximise revenues Maintain and update market entry action plans and trackers. Ensure all interlinked processes remain on schedule and compliant with relevant codes and standards. Define and implement settlement processes and trading strategies in collaboration with offtakers. Oversee system integration and software interface requirements for BM participation, settlement, and PPA/CfD delivery. Ensure readiness for live operations post-energisation and ongoing operational excellence across all contracted and merchant revenue streams. Work closely with procurement and development teams to identify local supply chain opportunities, contribute to local content strategies, and support stakeholder engagement. Assess and manage commercial risks related to revenue models, offtake structures, grid access, and policy changes. Liaise with development, finance, legal, and external stakeholders to align commercial inputs across the lifecycle of offshore wind projects Requirements 5-10+ years of experience in offshore wind or renewable energy, with a focus on route to market, PPAs, CfDs, or commercial strategy. Strong understanding of energy markets in the UK. Proven track record in dealing with utilities, corporate offtakers, or government entities. Familiarity with local supply chain development, industrial policy considerations, and content requirements. Experience with offshore grid development, interconnection, and TSO engagement. Bachelor's or master's degree in business, engineering, economics, energy policy, or a related field
Sep 01, 2025
Contractor
Market Access & Settlements Manager required for a major Offshore Wind Developer based in The United Kingdom Responsibilities Manage the end-to-end Elexon BSC accession process, including authorised persons, party role registration, BMU registration, and credit cover requirements. Secure any required waivers or testing approvals. Oversee appointment and coordination with Meter Operator Agent Manage installation, testing, and registration of SVA and CVA metering in compliance with CoP requirements. Ensure alignment of metering, aggregation rules, and data flows. Negotiate and execute pre-energisation supply agreements. Manage existing PPAs with ESB and SSE, including: Scheduling and dispatch coordination. Settlement and reconciliation of Balancing Mechanism revenues. Interface with trading desks to optimise offtake revenue. Oversee operational delivery of secured CfDs, including reporting, settlement, and compliance with Low Carbon Contracts Company (LCCC) obligations. Develop and deliver strategies for participation in the Capacity Market and ancillary services markets to maximise revenues Maintain and update market entry action plans and trackers. Ensure all interlinked processes remain on schedule and compliant with relevant codes and standards. Define and implement settlement processes and trading strategies in collaboration with offtakers. Oversee system integration and software interface requirements for BM participation, settlement, and PPA/CfD delivery. Ensure readiness for live operations post-energisation and ongoing operational excellence across all contracted and merchant revenue streams. Work closely with procurement and development teams to identify local supply chain opportunities, contribute to local content strategies, and support stakeholder engagement. Assess and manage commercial risks related to revenue models, offtake structures, grid access, and policy changes. Liaise with development, finance, legal, and external stakeholders to align commercial inputs across the lifecycle of offshore wind projects Requirements 5-10+ years of experience in offshore wind or renewable energy, with a focus on route to market, PPAs, CfDs, or commercial strategy. Strong understanding of energy markets in the UK. Proven track record in dealing with utilities, corporate offtakers, or government entities. Familiarity with local supply chain development, industrial policy considerations, and content requirements. Experience with offshore grid development, interconnection, and TSO engagement. Bachelor's or master's degree in business, engineering, economics, energy policy, or a related field
Transmission Lead Consent Manager required for a major Offshore Wind Developer based in the United Kingdom. Responsibilities Managing the deliverables of the consultants in the responsible areas. Responsible for stakeholder engagement in relevant EIA topics. Ensure strong cooperation within the Project for all packages in relation to consenting risk and deliverables including legal, stakeholder and engineering team. Ensure strong cooperation within the Project in relation to risk and deliverables. Close coordination with the Offshore Lead, Onshore Lead and Advisor, Land Manager and Commercial Development Manager. Responsible for identifying and communicating consenting and wider project risks as they become known to the Strategic Consent Lead and Workstream Consenting Manager and Deputy, to de risk for the project. Support upcoming Ground Investigation Survey works from a Consenting point of view, incl. risk management and advice to the Engineering workstream. Key tasks In respect of relevant topics, deliver Examination Strategy, Statements of Common Ground as well as written and oral answers to the Examining Authority. In conjunction with others, deliver buildable consent of the offshore and onshore elements of the project on time and to budget according to the programme. Input to and influence examination strategy in relevant EIA areas to minimise risk in line with the Project's expectations. Manage consenting risk including clear and proactive communication of risk to the Strategic Consents Manager and Consenting Manager and wider project team to prevent consenting issues in the project and flag potential risks. Lead external stakeholder engagement in relevant EIA topic areas. Manage and perform high level stakeholder engagement with key stakeholders on relevant project issues via consultants resulting in final Statements of Common Ground. Provide expert advice on consent and environmental project issues to maximise competitiveness to the project packages. Support Land Manager to secure access to survey works and landowner liaison.
Sep 01, 2025
Contractor
Transmission Lead Consent Manager required for a major Offshore Wind Developer based in the United Kingdom. Responsibilities Managing the deliverables of the consultants in the responsible areas. Responsible for stakeholder engagement in relevant EIA topics. Ensure strong cooperation within the Project for all packages in relation to consenting risk and deliverables including legal, stakeholder and engineering team. Ensure strong cooperation within the Project in relation to risk and deliverables. Close coordination with the Offshore Lead, Onshore Lead and Advisor, Land Manager and Commercial Development Manager. Responsible for identifying and communicating consenting and wider project risks as they become known to the Strategic Consent Lead and Workstream Consenting Manager and Deputy, to de risk for the project. Support upcoming Ground Investigation Survey works from a Consenting point of view, incl. risk management and advice to the Engineering workstream. Key tasks In respect of relevant topics, deliver Examination Strategy, Statements of Common Ground as well as written and oral answers to the Examining Authority. In conjunction with others, deliver buildable consent of the offshore and onshore elements of the project on time and to budget according to the programme. Input to and influence examination strategy in relevant EIA areas to minimise risk in line with the Project's expectations. Manage consenting risk including clear and proactive communication of risk to the Strategic Consents Manager and Consenting Manager and wider project team to prevent consenting issues in the project and flag potential risks. Lead external stakeholder engagement in relevant EIA topic areas. Manage and perform high level stakeholder engagement with key stakeholders on relevant project issues via consultants resulting in final Statements of Common Ground. Provide expert advice on consent and environmental project issues to maximise competitiveness to the project packages. Support Land Manager to secure access to survey works and landowner liaison.
Senior Marine Coordinator needed for a Major Offshore Wind Developer in Poland. Responsibilities: Oversee and Manage the Marine Coordination Centre (MCC) and associated personnel, systems and processes. Lead the safe, efficient, and compliant coordination of all marine activities associated with offshore wind farm construction and operations. Act as the primary point of contact for marine coordination across all phases of the offshore project. Ensure adherence to marine safety regulations, project standards, and environmental protection guidelines. Coordinate vessel traffic and offshore personnel transfer in real-time using marine coordination software. Maintain up-to-date marine coordination procedure. Manage interface with third-party contractors, vessel operators, port authorities, and maritime stakeholders. Lead daily marine coordination meeting. SIMOPS management between vessels and offshore assets. Monitor and assess metocean conditions to support safe maritime operations. Support incident investigations and root cause analyses. Collaborate with construction management teams to align marine coordination with overall project timelines and safety goals. Requirements: 3 to 5 years of documented experience as a senior marine coordinator. Right to work in Poland. Strong use of IT systems like the MS package. Team player, adaptable, works well in teams, strong communication abilities. Good English skills both writing and verbal.
Sep 01, 2025
Contractor
Senior Marine Coordinator needed for a Major Offshore Wind Developer in Poland. Responsibilities: Oversee and Manage the Marine Coordination Centre (MCC) and associated personnel, systems and processes. Lead the safe, efficient, and compliant coordination of all marine activities associated with offshore wind farm construction and operations. Act as the primary point of contact for marine coordination across all phases of the offshore project. Ensure adherence to marine safety regulations, project standards, and environmental protection guidelines. Coordinate vessel traffic and offshore personnel transfer in real-time using marine coordination software. Maintain up-to-date marine coordination procedure. Manage interface with third-party contractors, vessel operators, port authorities, and maritime stakeholders. Lead daily marine coordination meeting. SIMOPS management between vessels and offshore assets. Monitor and assess metocean conditions to support safe maritime operations. Support incident investigations and root cause analyses. Collaborate with construction management teams to align marine coordination with overall project timelines and safety goals. Requirements: 3 to 5 years of documented experience as a senior marine coordinator. Right to work in Poland. Strong use of IT systems like the MS package. Team player, adaptable, works well in teams, strong communication abilities. Good English skills both writing and verbal.
WTG Lead Engineer required for a major Offshore Wind Developer based in the United Kingdom. Responsibilities Act as technical focal point for all interactions between WTG and foundation primary steel components. Coordinate with foundation design teams to define and manage engineering milestones and timelines. Review and validate technical requirements from the turbine OEM and ensure compatibility with both foundation types, e.g. foundation interface flange Ensure timely delivery of interface documentation and alignment with engineering/project milestones Use a deep understanding of loads and analysis to prepare and execute the Integrated Load Analysis (ILA) required for the WTG/Foundation Coordinate with turbine OEM and project certification body to ensure that the project-specific WTG components comply with all code and regulatory requirements Manage exchange and review of certification deliverables for the primary steel design and loads calculation Drive the technical resolution of certification findings and ensure alignment across turbine OEMs and foundation designers. Oversee integration of LV equipment and secondary steel elements with both foundation types. Ensure secondary steel components do not clash with WTG access, maintenance, or installation requirements Support 3D model reviews, HAZIDs and HAZOPs, and provide input to secondary steel interface registers Interface with layout engineers and wind resource teams to incorporate WTG-specific constraints into the turbine micro-siting process Assess and advise on the impact of layout changes to WTG support structure design in layout decisions. Support the Work Package Manager in Project meetings or external meetings with OEMs, foundation designers, fabricators, and certification bodies. Efficiently interface and manage cross-functional topics with other work packages, internal stakeholders, and external partners. Track technical risks, interface issues, and change management within the WTG foundation scope. Prepare and review technical reports, meeting minutes, and input to project governance documentation. Requirements Knowledge of the mechanical systems and interfaces within a wind turbine. Experience in Integrated Load Analysis (ILA) process for WTG/Foundation. Exposure to wind turbine installation, commissioning or operations. Proficient in managing design interfaces with cross-functional disciplines. Experience working in the offshore industry, preferably offshore wind. Knowledge of relevant health and safety and environmental legislation. Innovative and creative thinking, ideally identifying opportunities to improve the business case and reduce technical risks. Review conflicting requirements to achieve an efficient system-level solution. You are effective in multi-stakeholder relationship building, demonstrated by your effective presentation, stakeholder management, communication and negotiation skills.
Sep 01, 2025
Contractor
WTG Lead Engineer required for a major Offshore Wind Developer based in the United Kingdom. Responsibilities Act as technical focal point for all interactions between WTG and foundation primary steel components. Coordinate with foundation design teams to define and manage engineering milestones and timelines. Review and validate technical requirements from the turbine OEM and ensure compatibility with both foundation types, e.g. foundation interface flange Ensure timely delivery of interface documentation and alignment with engineering/project milestones Use a deep understanding of loads and analysis to prepare and execute the Integrated Load Analysis (ILA) required for the WTG/Foundation Coordinate with turbine OEM and project certification body to ensure that the project-specific WTG components comply with all code and regulatory requirements Manage exchange and review of certification deliverables for the primary steel design and loads calculation Drive the technical resolution of certification findings and ensure alignment across turbine OEMs and foundation designers. Oversee integration of LV equipment and secondary steel elements with both foundation types. Ensure secondary steel components do not clash with WTG access, maintenance, or installation requirements Support 3D model reviews, HAZIDs and HAZOPs, and provide input to secondary steel interface registers Interface with layout engineers and wind resource teams to incorporate WTG-specific constraints into the turbine micro-siting process Assess and advise on the impact of layout changes to WTG support structure design in layout decisions. Support the Work Package Manager in Project meetings or external meetings with OEMs, foundation designers, fabricators, and certification bodies. Efficiently interface and manage cross-functional topics with other work packages, internal stakeholders, and external partners. Track technical risks, interface issues, and change management within the WTG foundation scope. Prepare and review technical reports, meeting minutes, and input to project governance documentation. Requirements Knowledge of the mechanical systems and interfaces within a wind turbine. Experience in Integrated Load Analysis (ILA) process for WTG/Foundation. Exposure to wind turbine installation, commissioning or operations. Proficient in managing design interfaces with cross-functional disciplines. Experience working in the offshore industry, preferably offshore wind. Knowledge of relevant health and safety and environmental legislation. Innovative and creative thinking, ideally identifying opportunities to improve the business case and reduce technical risks. Review conflicting requirements to achieve an efficient system-level solution. You are effective in multi-stakeholder relationship building, demonstrated by your effective presentation, stakeholder management, communication and negotiation skills.
Commercial Director required for a major Offshore Wind Developer based in The United Kingdom. Responsibilities Developing the Project Business Case; overseeing financial modelling, driving optimisation by liaison with technical, consents, asset package leaders and other project functions. Commercial (non-purchase agreements, CfD, OFTO, PPAs, Insurance, hedging, etc. Project Finance: ensuring the project is 'bankable', engagement of and liaison with advisors. Liaison with project finance functions in shareholder organisations. Financial; overseeing the Finance Manager effecting all accounting and treasury functions. Leading cost control, forecasting and management systems. Liaison with shareholder asset managers on matters in relation to the Joint Venture Company. Managerial oversight of the Legal function within the project; (note the Project Counsel also has dotted line responsibility direct to the PD). Risk management; ensuring balanced risk proposition in the business case. Route to Market strategy definition & implementation. Ensuring comprehensive and robust management and control systems and procedures are in place and being implemented effectively. Requirements Degree qualified in Mathematics, Engineering or other highly numerate discipline. Extensive experience of large scale (750MW+) Offshore Wind Farm business case development. Extensive experience in project commercial and finance functions in the renewable energy sector (this may include some or all of economic evaluation, deal structuring, energy markets and trading, hedging, insurance). Good all-round understanding of commercial, financial, business principles and risk mitigation practices. A good understanding and general experience of the Development, Construction and Operational phases of an offshore wind projects.
Sep 01, 2025
Contractor
Commercial Director required for a major Offshore Wind Developer based in The United Kingdom. Responsibilities Developing the Project Business Case; overseeing financial modelling, driving optimisation by liaison with technical, consents, asset package leaders and other project functions. Commercial (non-purchase agreements, CfD, OFTO, PPAs, Insurance, hedging, etc. Project Finance: ensuring the project is 'bankable', engagement of and liaison with advisors. Liaison with project finance functions in shareholder organisations. Financial; overseeing the Finance Manager effecting all accounting and treasury functions. Leading cost control, forecasting and management systems. Liaison with shareholder asset managers on matters in relation to the Joint Venture Company. Managerial oversight of the Legal function within the project; (note the Project Counsel also has dotted line responsibility direct to the PD). Risk management; ensuring balanced risk proposition in the business case. Route to Market strategy definition & implementation. Ensuring comprehensive and robust management and control systems and procedures are in place and being implemented effectively. Requirements Degree qualified in Mathematics, Engineering or other highly numerate discipline. Extensive experience of large scale (750MW+) Offshore Wind Farm business case development. Extensive experience in project commercial and finance functions in the renewable energy sector (this may include some or all of economic evaluation, deal structuring, energy markets and trading, hedging, insurance). Good all-round understanding of commercial, financial, business principles and risk mitigation practices. A good understanding and general experience of the Development, Construction and Operational phases of an offshore wind projects.